aglomancha.com utiliza cookies para mejorar la experiencia de los usuarios, facilitando la navegación por nuestra web.

Para saber más sobre el uso que hacemos de las cookies, consulta nuestra Política sobre el uso de cookies. Leer más

Acepto
Russian (CIS)Română (România)French (Fr)Polish (Poland)Arabic (العربية الموحدة)Español (spanish formal Internacional)English (United Kingdom)

Aglomancha

Hydraulic works

Supply improvement works in VALDEPEÑAS (CIUDAD REAL) AND ITS SPHERE OF INFLUENCE

 

 

  • The pipes are made in two stages.
  • The PRFV pipe (polyester reinforced with fibreglass) has a 700mm diameter, and it is 17.308 m long, from Fresneda´s reservoir to Santa Cruz de Mudela.

 

The pipes and rest of the elements, which supplied the towns near Valdepeñas with drinking water age and bad state, make it necessary the construction of new pipes which guarantee the drinking water supply

 

 

  • The pipe route is extended throughout the current pipes, getting separated from it in the areas where the rock is likely to be blown up.
  • Besides, it includes Valdepeñas tank restoration for minimizing the escapes, and a new 3.000 m3 of two waterproof half tanks.
 

Aglomancha Avda Alfonso X el Sabio 1, 1º C
13001 - Ciudad Real - Spain
+ 34926273073
+ 34926273083
Fax: +34926273075

| © Aglomancha - Avda Alfonso X el Sabio 1, 1º - Cp 13001 - Ciudad Real - Spain |